Solar Subsidy

Government Solar Subsidy Assistance in Lucknow

We help eligible homeowners understand and navigate the applicable rooftop solar subsidy scheme, from documentation to DISCOM approval.

Documentation assistance
Indicative subsidy guidance
Application status support
Solar panels on a rooftop with a document icon representing subsidy application support
Scheme Overview

Understanding PM Surya Ghar Muft Bijli Yojana

PM Surya Ghar Muft Bijli Yojana is a central government initiative designed to encourage residential rooftop solar adoption across India by offering subsidy support toward eligible system costs. The scheme aims to help households reduce their electricity bills while contributing to broader renewable energy adoption goals.

Because scheme rules, subsidy slabs and application processes are set and periodically updated by the relevant government authorities and DISCOMs, we recommend treating the figures on this page as indicative and confirming current terms with our team before finalising your decision.

Scheme Objectives

Increase household adoption of rooftop solar power across India
Reduce residential electricity costs through self-generation
Support India's broader renewable energy and emissions goals
Simplify the process of going solar through structured subsidy support
Eligibility

Who Can Apply

General eligibility categories — final confirmation depends on current scheme rules and your specific property.

Independent houses and residential bungalows
Apartments and flats (subject to society/RWA approval for common infrastructure)
Group housing societies (common-area category)
Select institutional properties, subject to current scheme classification

Documents Checklist

Latest electricity bill (showing consumer/account number)
Proof of property ownership or occupancy (as required by your DISCOM)
Identity proof (Aadhaar or other accepted government ID)
Bank account details for subsidy disbursal
Passport-size photograph, where required
Signed application/consent form for the empanelled vendor
Subsidy Table

Subsidy Slabs by System Capacity

A simple residential and housing-society subsidy overview to help customers compare system sizes quickly.

System CapacityIndicative SubsidySuitable PropertyEst. Customer Contribution
Up to 2 kWIndicative subsidy support availableResidentialBalance after subsidy, indicative
Above 2 kW – 3 kWIndicative subsidy support available (higher slab)ResidentialBalance after subsidy, indicative
Above 3 kWIndicative subsidy capped at the 3 kW slab amountResidentialHigher balance, capped subsidy
Group Housing Society (GHS) common areasIndicative subsidy per residential unit, subject to capsHousing SocietyAs per society-level assessment
Application Process

Step-by-Step Application Process

STEP 01

Register / Enquire

Share your details and electricity consumer number to begin the process.

STEP 02

Free Site Survey

Our team assesses your rooftop and confirms indicative eligibility.

STEP 03

System Recommendation

Receive a right-sized system proposal aligned with subsidy slabs.

STEP 04

Application Submission

We help submit your application through the applicable national portal/DISCOM process.

STEP 05

Installation by Empanelled Vendor

Installation completed following documented safety practices.

STEP 06

Net Metering & Inspection

DISCOM inspection and net meter installation/activation.

STEP 07

Subsidy Disbursal

Subsidy amount released to your registered bank account by the relevant authority.

Installation Process

How Installation Fits Into the Subsidy Timeline

STEP 01

Enquiry

Initial discussion on your electricity bill and rooftop.

STEP 02

Site Survey

On-site assessment of roof condition and shading.

STEP 03

Design & Quotation

System sizing aligned with your eligible subsidy slab.

STEP 04

Subsidy Application

Documentation prepared and submitted on your behalf.

STEP 05

Installation

Certified technicians complete a safe, documented installation.

STEP 06

Net Metering & Handover

DISCOM inspection, activation, and formal handover.

Vendor Selection

Choosing the Right Vendor

Work with a vendor who is transparent about empanelment status, provides itemised quotations, and has a track record of documented, safety-compliant installations. Avoid vendors who guarantee subsidy approval — no vendor controls the government's final decision.

DISCOM Process

Working With Your DISCOM

Your local electricity distribution company reviews your application, schedules a site inspection, and approves net metering. Response times vary by DISCOM and current application volumes.

Net Metering & Inspection

Net Metering and Inspection

After installation, a DISCOM inspection verifies safety and compliance before your net meter is installed or activated, enabling accurate billing for imported and exported units.

Timeline

Expected Timeline & Common Delays

There is no universally fixed timeline for subsidy disbursal — it depends on DISCOM processing speed, application volume, inspection scheduling, and how promptly required documents are submitted correctly the first time. Below are common reasons applications take longer than expected.

  • Incomplete or mismatched documentation (name, address or consumer number discrepancies)
  • DISCOM inspection scheduling and site-visit backlogs
  • High application volumes during scheme promotional periods
  • Bank account verification or linking issues for subsidy disbursal
  • Site-specific technical issues identified during inspection requiring correction
Avoid These Mistakes

Common Application Mistakes

  • Selecting a non-empanelled or unverified vendor, risking subsidy ineligibility
  • Submitting applications with mismatched name/address across documents
  • Oversizing the system beyond what the subsidy scheme's slab structure supports efficiently
  • Not confirming net metering feasibility with the DISCOM before installation
  • Assuming subsidy approval before formal confirmation from the relevant authority
FAQs

Solar Subsidy — Frequently Asked Questions

It is a central government scheme aimed at promoting rooftop solar adoption among residential electricity consumers through subsidy support, subject to eligibility criteria and current scheme guidelines that can change over time.

Eligibility generally depends on property type (primarily residential), having a valid electricity connection and consumer number, and meeting the current scheme's specific criteria. We help verify eligibility during your free site survey.

Commonly required documents include your latest electricity bill, identity proof, proof of property ownership/occupancy, and bank account details for disbursal — see our documents checklist above.

Timelines vary based on DISCOM processing speed, application volumes, and inspection scheduling — there is no fixed guaranteed timeline, and we recommend planning with some flexibility.

No. Subsidy is subject to eligibility verification, DISCOM approval, and inspection outcomes. We do not guarantee subsidy approval — final decisions rest with the relevant government and DISCOM authorities.

The primary rooftop subsidy scheme is generally targeted at residential connections. Commercial and industrial customers should explore alternative avenues such as accelerated depreciation — see our Commercial Solar and Industrial Solar pages.

Your local DISCOM (Distribution Company) reviews your application, conducts site inspection, approves net metering, and coordinates with the subsidy disbursal process alongside the relevant national/state agency.

Net metering is the billing arrangement that credits surplus solar power you export to the grid. Most subsidy-eligible systems are grid-connected systems that use net metering, installed and approved through your DISCOM.

Subsidy schemes generally require installation through an empanelled or otherwise scheme-compliant vendor — verify current vendor eligibility requirements as part of your application.

Following a successful inspection, the net meter is installed/activated, and the subsidy amount is processed for disbursal to your registered bank account by the relevant authority, subject to their processing timelines.

Most subsidy schemes provide an online portal or reference number to track application status; we assist customers in monitoring their application where such tracking is available.

Rejection reasons vary — often related to documentation or eligibility issues — and in many cases can be corrected and resubmitted. Our team helps identify the cause and next steps if this occurs.

Apply for Subsidy Assistance

Share your details and our team will assess your indicative eligibility.

Have Questions About Your Subsidy Eligibility?

Get a free WhatsApp consultation with our subsidy documentation team.

Call WhatsApp Get Quote